Every owners who are renovating the house will meet woodworking。How do we check the quality of construction??The following is the editorial sharing of dry goods?
1。 WoodworkDecorationQuality inspection technology
1。 After installing, the door frame with home-style door frame is not flat.:The main reason is that when the vertical opening is performed,No thickness of the plaster layer。
2。 The size of the door and window open position reserved is incorrect:After installing the door and window,The gap around the door and window frame is too large or too small.; The opening size of the doors and windows is incorrect。Left distance is uneven;Line find rules,More deviation。under normal circumstances, The upper skin position of the door and window frame should be lower than the door.10-15mm。The lower masonry of the window frame should be more than the top of the window sill.5mm。
3。 Door and window frame installation is not sufficient:The number of embedded wooden bricks is too small or the wooden brick is installed.; Half brick walls are not installed with wooden brick prefabricated concrete blocks,But directly used wood bricks,Penetrately,Precast concrete partboard wood bricks should be buried during the prefabrication process,Make sure to securely install the door and window frame。The brick setting must meet the requirements of quantity and spacing。
4。 Hinge is uneven,Screw loose,Nuts are tilted,Missing screw,The depth of the hinge groa is different:Screw is too long or screwed in a certain angle during installation。During the installation process,Require screw into the screw1/3And screw2/3。Do not tilt when tightening,If there is a wooden knot during the installation process,Drilling in junction,Tighten the screw after re-insert the cork,Simultaneously, Be careful not to miss the screw。
5, Upper and down doors and windows are 易彤破壁机维修网点 not flat,Left and right doors and windows are not installed,Reserved position of holes:Before installation, This bank is not used to find rules as needed,No hanging vertical line,Not according to the installation process50Centimeter cable find rules。To solve this problem,Require constructor must follow process requirements,Before constructing and installation,Like the line to find the rules,First install the model after preparing,After assessing the requirements,Then completely installed。
2。 acceptWoodworkConstruction attentionmatter
Understanding woodworking and its standards will help you do better in woodworking construction.。Details are as follows:
1。 Whether the decorative woodworking project is defective。It should ensure that the decorative surface of the woodworking project is flat.,No drum or break。
2。 Whether the decorative role is accurate。The method of rotation is the angle of rotation90degree,Except for specialDecorationDesign factors。
3。 Whether the decoration is strict and accurate。Correct decorative wooden floor,No gap or uniform separation distance between each other。
4。 decorationradianWhether or not the roundness is smooth。In addition to the shape of multiple models with the same decoration and decoration, it should be consistent。
5, Whether the cabinet door switch is normal。When the cabinet door is opened, it should be easy to operate and there is no abnormal sound.。
6。 usually, There should be a gap between the fixed cabinet and the wall.。
7。 Whether the decorative structure is straight。Regardless of the horizontal or vertical direction, the correct woodworking decoration method should be straight。
8。 Symmetric decorative woodworking project is symmetrical。
9。 Does the nail hole of the decorative panel have been patch?Of course this is the work of the painter,But because it exists in the woodworking project, Here mentioned here。
10。 decorationsmallpoxWhether the connection point of the line angle line is smooth,Is there a significant irregularity and deformation。
11。 After decoration Whether the anchor is straight and accurately installed on the ground。
12 After decoration AluminumsmallpoxWhether the board is PVCThe plate and other toilets and kitchens are flat,No deformation。
13 Check if the installation position of the cabinet door lock is correct,Can I open it normally after the decoration?。
14。 Does the leaves of the decorative bedroom door and other doors open normally。Turn off the upper layer, Left and right gates should be close,The gap between the door is properly,Usually0。5cmbetter。